Leashboss Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training Play Camping or Backyard 30 Feet 0JMBZORDJFE7203

Leashboss Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training Play Camping or Backyard 30 Feet 0JMBZORDJFE7203

$24.98  $22.48Save: 10% off
  • 1000 Units in Stock





NYLON TRAINING LEAD - This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for medium and large dogs. You'll love using it as a backyard dog leash, for off leash dog training, and more. COMFORTABLE HANDLE PREVENTS LEASH-BURN - The rubber molded handle on this nylon dog leash bends slightly and will last over the years. It is very comfortable in your hands! HAND CRAFTED IN THE USA - We source the highest quality materials from vendors around the US and hand assemble every leash in California. With every design, we strive to make the best dog leash possible. DIMENSIONS – This dog leash measures 3/4 inch wide by 30 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming! 5 YEAR MANUFACTURER'S WARRANTY - Leashboss products automatically come with 'The Boss Promise', a 5 year manufacturers warranty that protects against defects, product issues, and chewed leashes.